Summary for Test 2023-08-03-86-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
---|---|
DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
Award Date | 02/05/2021 |
Closeout Date | Not set |
Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
Sample Taken Date | 08/03/2023 | Sample Unique Key | 86 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/03/2022 |
Sample type | Department Acceptance | A brief description of the sample | pcc agg |
The quantity of what the sample constitutes | 40CY | From where was the sample collected | Distributor |
First name of sampler or witnessed by | luis | Last name of sampler or witnessed by | acosta |
Title of sampler | tet | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | cemex fontana | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0040 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | 1610838 | Lot number | |
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-08-03-86
DIME Test ID: 2023-08-03-86-1
Testing Lab: CT D07 - Plant Services
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-09-28
Test Results
What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: David P
Date of test: 08/11/2022
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 98 %
Cumulative percent passing the #8 sieve: 88 %
Cumulative percent passing the #16 sieve: 71 %
Cumulative percent passing the #30 sieve: 49 %
Cumulative percent passing the #50 sieve: 25 %
Cumulative percent passing the #100 sieve: 9 %
Cumulative percent passing the #200 sieve: 2.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/28/2023 ✔