Summary for Test 2023-09-20-45-1
Test performed: AASHTO T27-14Project Information
Project Identifiers | Project ID: 994431 DEA: 024J1604 EFIS: 0222000145 |
---|---|
DIST-CO-RTE-PM | 02--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 2 (Verified on 03/28/2023) |
Sample Information
Sample Taken Date | 09/20/2023 | Sample Unique Key | 45 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/26/2023 |
Sample type | Production Start-Up | A brief description of the sample | Lime Treated 3/4-inch Type A Aggregate |
The quantity of what the sample constitutes | Production Start Up Evaluation | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Dawn | Last name of sampler or witnessed by | Sloaterman |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | D79353F | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Hat Creek Construction and Materials – Ward Lake Plant (Litchfield, CA) | Transportation Laboratory (TL) Number | 858050 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-18-0008::Ward Lake Pit (Litchfield, CA) |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Mathematically Combined per CT 384 | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-09-20-45
DIME Test ID: 2023-09-20-45-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2023-10-03
Test Results
What type of gradation is being tested?: HMA Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Colt Sweeny
Date of test: 09/26/2023
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 98 %
Cumulative percent passing the 1/2 in. sieve: 84 %
Cumulative percent passing the 3/8 in. sieve: 77 %
Cumulative percent passing the #4 sieve: 49 %
Cumulative percent passing the #8 sieve: 33 %
Cumulative percent passing the #16 sieve: 22 %
Cumulative percent passing the #30 sieve: 16 %
Cumulative percent passing the #50 sieve: 11 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 5.5 %
General comments (publicly viewable) (Max 1000 characters): CT 384: Combined at 77.0% Cold Feed and 23.0% Reclaimed Aggregate;
P1″=100.%,
P¾″=98%,
P½″=84%,
P№4=49%,
P№8=33%,
P№30=16%,
P№200=5.5%
Test was verified on 10/3/2023 ✔