Summary for Test 2023-09-20-4-1
Test performed: ASTM C143-20Project Information
| Project Identifiers | Project ID: 214830 DEA: 043G6304 EFIS: 0412000409 |
|---|---|
| DIST-CO-RTE-PM | 04-SCL-4-SCl-9 -4.75/4.9 |
| Award Date | 11/08/2022 |
| Closeout Date | Not set |
| Work Description | Saratoga Creek Bridge Rehabilitation Project |
| Location Description | San Jose - Saratoga Creek |
| QA Service Level | 1 (Verified on 11/09/2020) |
Sample Information
| Sample Taken Date | 09/20/2023 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/21/2023 |
| Sample type | Quality Control | A brief description of the sample | 1 cubic ft. of Concrete taken from middle of batching |
| The quantity of what the sample constitutes | 1 cubic ft. of Concrete for Testing | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Mark Patrick | Last name of sampler or witnessed by | Baddu |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | ConFab Lathrop | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | VER-98LV |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 9511 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Bed Echo, Truck 1 | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-09-20-4
DIME Test ID: 2023-09-20-4-1
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2023-09-25
Test Results
Input Type: Calculated
Tester's full name: Patrick Wright
Date of test: 09/20/2023
Slump: 25 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/25/2023 ✔
