Summary for Test 2023-08-31-41-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 214830
DEA: 043G6304
EFIS: 0412000409
DIST-CO-RTE-PM04-SCL-4-SCl-9 -4.75/4.9
Award Date11/08/2022
Closeout DateNot set
Work DescriptionSaratoga Creek Bridge Rehabilitation Project
Location DescriptionSan Jose - Saratoga Creek
QA Service Level1 (Verified on 11/09/2020)

Sample Information

Sample Taken Date08/31/2023 Sample Unique Key41
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/05/2023
Sample typeQuality Assurance A brief description of the sampleBearing Pad
The quantity of what the sample constitutes1 From where was the sample collectedManufacturer
First name of sampler or witnessed byWilliam Last name of sampler or witnessed byShanklin
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameScougal Rubber Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)23243-1
Material/Compound/Elastomer IDNA Samples Representing1
Description (size)2.3" x 8" x 15" Comments
Description (Number of Shims)4 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch NumberNA

Test Details

DIME Sample ID: 2023-08-31-41
DIME Test ID: 2023-08-31-41-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2023-09-21

Test Results


Input Type: Measured
Tester's full name: Adam Herrera
Date of test: 09/21/2023
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/21/2023