Summary for Test 2023-06-21-81-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 994514
DEA: 043Y0504
EFIS: 0423000192
DIST-CO-RTE-PM04-SOL-12112113-var/var
Award Date01/12/2023
Closeout Date03/11/2024
Work DescriptionPAVEMENT REPAIR
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date06/21/2023 Sample Unique Key81
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/28/2023
Sample typeQuality Assurance A brief description of the sample3/4-INCH HMA Types A and B W/15%RAP
The quantity of what the sample constitutes2 boxes From where was the sample collectedSource
First name of sampler or witnessed byNick Last name of sampler or witnessed byHall
Title of sampler Telephone number of sampler7072999133
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Vallejo Batch Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number41110150LB0122

Test Details

DIME Sample ID: 2023-06-21-81
DIME Test ID: 2023-06-21-81-1
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-09-12

Test Results


What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 06/28/2023
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2151.0 g
Mass Loss: 168.4 g
Correction Factor (Percent by mass of HMA Specimen): 5.76 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.11 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 1.83 %
General comments (publicly viewable) (Max 1000 characters): Vulcan Vallejo Batch Plant

Test was verified on 9/12/2023