Summary for Test 2023-08-30-52-2

Test performed: AASHTO T301-22

Project Information

Project IdentifiersProject ID: 994724
DEA: 010M0804
EFIS: 0122000084
DIST-CO-RTE-PM01-HUM-255-0.5/8.6
Award Date06/09/2023
Closeout Date01/22/2024
Work DescriptionMICROSURFACING, REPLACE AC SURFACING, AND MODIFY SIGNAL SYSTEMS.
Location DescriptionHUMBOLDT COUNTY IN EUREKA FROM 0.3 MILE NORTH OF EUREKA CHANNEL BRIDGE TO G STREET IN ARCATA
QA Service Level1 (Verified on 04/25/2023)

Sample Information

Sample Taken Date08/30/2023 Sample Unique Key52
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/07/2023
Sample typeQuality Assurance A brief description of the sampleMSE
The quantity of what the sample constitutestwo emulsion samples From where was the sample collectedFabricator
First name of sampler or witnessed byMolly Last name of sampler or witnessed byGibney
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVSS Emultech West Sac Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphaltic Emulsion Emulsion GradeMSE
Lot NumberNot set Sub LotNot set

Test Details

DIME Sample ID: 2023-08-30-52
DIME Test ID: 2023-08-30-52-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2023-09-11

Test Results


Input Type: Measured
Tester's full name: Alonso Lopez-Sanchez
Date of test: 09/11/2023
Final Reading from the testing machine (X): 3 cm
% Elongation Recovery: 85 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/11/2023