Summary for Test 2023-08-29-46-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 215314 DEA: 07333004 EFIS: 0716000298 |
---|---|
DIST-CO-RTE-PM | 07-LA-5,5-15.1/22.9 |
Award Date | 10/20/2022 |
Closeout Date | Not set |
Work Description | PROJECT PILOT 1 |
Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES ON ROUTE 5 FROM 0.1 MILE SOUTH OF CALZONA STREET TO 0.1 MILE SOUTH OF RIVERSIDE DRIVE AND ROUTE 2 AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER |
QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
Sample Taken Date | 08/29/2023 | Sample Unique Key | 46 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/29/2023 |
Sample type | Acceptance | A brief description of the sample | Soil for structure backfill. |
The quantity of what the sample constitutes | NA | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | 23-413 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | 8232023 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | NA |
---|---|---|---|
The fabricator/manufacturer designation for the sample | NA | A detailed description of where the material sample was collected | Job site |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-08-29-46
DIME Test ID: 2023-08-29-46-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-09-01
Test Results
Number of tests: 2
Input Type: Measured
Tester's full name: Chad Chotibhongs
Date of test: 09/01/2023
Temperature correction: 0
Temperature of solution: 75
Clay reading (test 1): 13.6
Sand reading (test 1): 6.9
Clay reading (test 2): 13.5
Sand reading (test 2): 7
Sand equivalent (test 1): 51
Sand equivalent (test 2): 52
Sand equivalent before temperature correction: 52
Sand equivalent after temperature correction: 52
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/1/2023 ✔