Summary for Test 2017-01-04-1-6
Test performed: ASTM C191-13Project Information
Project Identifiers | Project ID: 88888 DEA: SMTL-STOCK EFIS: SMTL-STOCK |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 01/04/2017 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/04/2017 |
Sample type | Annual Source Testing | A brief description of the sample | Type II/IV |
The quantity of what the sample constitutes | 1 Bucket | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | CM165645 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Lehigh Redding | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Cementitious | Brand | Lehigh |
---|---|---|---|
Mill | Redding | Type of Cementitious Material | Type II/V Cement |
Test Details
DIME Sample ID: 2017-01-04-1
DIME Test ID: 2017-01-04-1-6
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C191-13: Standard Test Methods for Time of Setting of Hydraulic Cement by Vicat Needle
Test Release Date: 2019-03-22
Test Results
Input Type: Measured
Tester's full name: timothy omalley
Date of test: 02/03/2017
Type of Water Used: Type III grade reagent water
Time in minutes of last penetration greater than 25mm (E): 105 min
Time in minutes of first penetration less than 25mm (H): 125 min
Penetration reading at time E : 30 mm
Penetration reading at time H: 16 mm
Initial time of setting: 112 min
Final time of setting: 0 min
Method Used: Test Method A
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/22/2019 ✔