Summary for Test 2023-08-29-11-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 215314 DEA: 07333004 EFIS: 0716000298 |
---|---|
DIST-CO-RTE-PM | 07-LA-5,5-15.1/22.9 |
Award Date | 10/20/2022 |
Closeout Date | Not set |
Work Description | PROJECT PILOT 1 |
Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES ON ROUTE 5 FROM 0.1 MILE SOUTH OF CALZONA STREET TO 0.1 MILE SOUTH OF RIVERSIDE DRIVE AND ROUTE 2 AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER |
QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
Sample Taken Date | 08/29/2023 | Sample Unique Key | 11 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/29/2023 |
Sample type | Acceptance | A brief description of the sample | Structural Backfill |
The quantity of what the sample constitutes | 135 SF | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
Title of sampler | TET | Telephone number of sampler | 310-345-6204 |
Laboratory sample identification | 23-1305 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Structural Backfill |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Various locations | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-08-29-11
DIME Test ID: 2023-08-29-11-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-08-30
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 08/29/2023
Gage No.: 60137
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 3
Depth: 12
Material No.: no data
Material Type: Structural Backfill
Impact By: Michelangelo Sese
Standard Count Density: 2234 g/cc
Count or Density 1: 1.89 g/cc
Count or Density 2: 1.82 g/cc
Count or Density 3: 1.85 g/cc
Standard Count Moisture: 660 g/cc
Moisture Count 1: 0.17 g/cc
Moisture Count 2: 0.08 g/cc
Moisture Count 3: 0.12 g/cc
Sum of Count or Density: 5.56 g/cc
Average of Count or Density: 1.85 g/cc
Sum of Moisture Count: 0.37 g/cc
Average of Moisture Count: 0.12 g/cc
Calculated Percent Relative Compaction: 84.6 %
Reported Percent Relative Compaction: 85 %
General comments (publicly viewable) (Max 1000 characters): Rte. 5 SB @ Indiana Off-Ramp
RW-810
Sta. 803+35 to Sta. 804+70
Test was verified on 8/30/2023 ✔