Summary for Test 2023-08-18-44-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 214336
DEA: 07302404
EFIS: 0713000488
DIST-CO-RTE-PM07-VEN-101-37/40
Award DateNot set
Closeout DateNot set
Work DescriptionPADRE JUAN REHAB
Location DescriptionVEN 101
QA Service Level1 (Verified on 02/26/2021)

Sample Information

Sample Taken Date08/18/2023 Sample Unique Key44
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/16/2023
Sample typeDepartment Acceptance A brief description of the sample3/4" Recycled Base
The quantity of what the sample constitutes1200 CY From where was the sample collectedManufacturer
First name of sampler or witnessed byKevin Last name of sampler or witnessed byHopkins
Title of samplerPlant Inspector Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Construction Portable Jobsite Plant Transportation Laboratory (TL) NumberC081823A
Inspector Lot Number from the Transportation Laboratory (TL) FormKH115O Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Granite Construction: On-site Recycled Base
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedConveyor Belt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design numberG3-22-LRCYB-297R Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-08-18-44
DIME Test ID: 2023-08-18-44-1
Testing Lab: CT D07 - Plant Services
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-08-31

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Kevin Hopkins
Date of test: 08/20/2023
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 92 %
Cumulative percent passing the 1/2 in. sieve: 62 %
Cumulative percent passing the 3/8 in. sieve: 51 %
Cumulative percent passing the #4 sieve: 35 %
Cumulative percent passing the #8 sieve: 26 %
Cumulative percent passing the #16 sieve: 19 %
Cumulative percent passing the #30 sieve: 14 %
Cumulative percent passing the #50 sieve: 10 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 4.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/31/2023