Summary for Test 2023-08-07-49-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
Award Date | 03/01/2021 |
Closeout Date | Not set |
Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
Location Description | 101 freeway in Summerland, CA |
QA Service Level | 1 (Verified on 05/06/2021) |
Sample Information
Sample Taken Date | 08/07/2023 | Sample Unique Key | 49 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/07/2023 |
Sample type | Quality Assurance | A brief description of the sample | CL 1 AS |
The quantity of what the sample constitutes | 1 days placement | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Darren | Last name of sampler or witnessed by | LaChaine |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | On Site Stockpile | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | On Site Stockpile | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-08-07-49
DIME Test ID: 2023-08-07-49-1
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-08-16
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Measured
Tester's full name: Mike Bennet
Date of test: 08/08/2023
Cumulative Mass Retained | Cumulative Percent Passing | |||||
---|---|---|---|---|---|---|
5070 grams | ||||||
0 grams | 100 % | |||||
0 grams | 100 % | |||||
0 grams | 100 % | |||||
0 grams | 100 % | |||||
79 grams | 98 % | |||||
238 grams | 95 % | |||||
997 grams | 80 % | |||||
1524 grams | 70 % | |||||
2583 grams | 49 % | |||||
524 grams | ||||||
115 grams | 38 % | |||||
193 grams | 31 % | |||||
268 grams | 24 % | |||||
344 grams | 17 % | |||||
408 grams | 11 % | |||||
445 grams | 7 % |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/16/2023 ✔