Summary for Test 2023-03-02-55-2

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date03/02/2023 Sample Unique Key55
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/03/2023
Sample typeQuality Control A brief description of the sample3/8" rock and sand
The quantity of what the sample constitutes1 Bag From where was the sample collectedSupplier
First name of sampler or witnessed byGlenn Last name of sampler or witnessed byMcCall
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identificationSet 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNational Ready Mix Artesia Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0027
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBelt Cut
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design numberS72019 Lot number1
Sublot number1 Aggregate Mix Number

Test Details

DIME Sample ID: 2023-03-02-55
DIME Test ID: 2023-03-02-55-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-08-15

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Glenn McCall
Date of test: 03/03/2023
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 97 %
Cumulative percent passing the #8 sieve: 86 %
Cumulative percent passing the #16 sieve: 70 %
Cumulative percent passing the #30 sieve: 48 %
Cumulative percent passing the #50 sieve: 23 %
Cumulative percent passing the #100 sieve: 10 %
Cumulative percent passing the #200 sieve: 5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/15/2023