Summary for Test 2023-03-02-48-3
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
Sample Taken Date | 03/02/2023 | Sample Unique Key | 48 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/03/2023 |
Sample type | Quality Control | A brief description of the sample | 1in, 3/8 in, WCS |
The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Ryan | Last name of sampler or witnessed by | Milum |
Title of sampler | QC Field Technician | Telephone number of sampler | |
Laboratory sample identification | Mix 1610838 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Job site | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0040 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Set 1 | The fabricator/manufacturer designation for the sample | |
The plant number | A detailed description of where the material sample was collected | Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | 1610838 | Lot number | 1 |
Sublot number | 1 | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-03-02-48
DIME Test ID: 2023-03-02-48-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-08-08
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Ryan Milum
Date of test: 03/03/2023
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 0
Sand reading (test 1): 0
Sand equivalent (test 1): 84
Sand equivalent before temperature correction: 84
Sand equivalent after temperature correction: 84
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/8/2023 ✔