Summary for Test 2023-08-02-24-1
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 993717 DEA: 021J8304 EFIS: 0220000148 |
---|---|
DIST-CO-RTE-PM | 02-SHA,TEH-5,36,44-VAR |
Award Date | 06/15/2022 |
Closeout Date | 05/06/2024 |
Work Description | REINF STRUCTURAL CONC BRIDGE, APPROACH SLAB & POLYESTER CONC OVERLAY. |
Location Description | SHASTA AND TEHAMA COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 04/11/2022) |
Sample Information
Sample Taken Date | 08/02/2023 | Sample Unique Key | 24 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/02/2023 |
Sample type | Acceptance | A brief description of the sample | polyester |
The quantity of what the sample constitutes | BRIDGE DECK | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | Thakur |
Title of sampler | Telephone number of sampler | 9152961873 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | AT THE JOB SITE | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
---|---|---|---|
Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
Direction of Travel | Not set | Post Mile | Not set |
Lanes to be Tested | Not set | Station | Not set |
Test Details
DIME Sample ID: 2023-08-02-24
DIME Test ID: 2023-08-02-24-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-08-04
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 08/02/2023
Air Temperature: 80
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: NIGHT/WARM
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN APPROACH SLAB
Edge used to measure position: LEFT OF ROAD EDGE
Reference Distance 1: 3
Reference Distance 2: 6
Reference Distance 3: 9
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 16
Position for Stationing 2: 16
Position for Stationing 3: 16
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.44
Corrected Coefficients of Friction for Stationing 2: 0.42
Corrected Coefficients of Friction for Stationing 3: 0.42
Average Coefficient of Friction: 0.43
General comments (publicly viewable) (Max 1000 characters): COW CREEK BRIDGE #06-0152 APPROACH SLAB. VISUALLY INSPECTED WB AND NO ISSUES SPOTTED AND LOOKS AS GOOD AS EB
Test was verified on 8/4/2023 ✔