Summary for Test 2023-07-28-28-3

Test performed: CTM 557-June 2020

Project Information

Project IdentifiersProject ID: 993715
DEA: 010G1404
EFIS: 0116000129
DIST-CO-RTE-PM01-HUM-96,169-VAR
Award Date11/16/2022
Closeout DateNot set
Work DescriptionHUM 96-169 5 Bridges Rail Upgrade (Do not include in project name: STRUCTURAL STEEL, CONCRETE BARRIER, POLYESTER CONCRETE OVERLAY)
Location DescriptionHUMBOLDT COUNTY ON ROUTES 96 AND 169 AT VARIOUS LOCATIONS (Bridge Nos. 04-0215, 04-0059, 04-0063, 04-0225, 04-0061)
QA Service Level1 (Verified on 04/19/2022)

Sample Information

Sample Taken Date07/28/2023 Sample Unique Key28
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/29/2023
Sample typeQuality Assurance A brief description of the sampleStructural concrete polymer fiber
The quantity of what the sample constitutes16 From where was the sample collectedJob Site
First name of sampler or witnessed byJoe Last name of sampler or witnessed byPedroni
Title of samplerASR Telephone number of sampler7075106120
Laboratory sample identificationC0163 Linked DIME Sample ID
The fabricator/manufacturer/facility nameMercer Fraser Willow Creek Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier12-04-0059
Structure nameAikens Creek Bridge

Material Information

Material TypeConcrete The concrete mix design numberMFWCBRDKSLAG
The truck number from where the sample was collected695 The batch plant ticket number from where the sample was collectedWC01209
Concrete batch plantWillow Creek The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge chute from back of truck Where the material sample would have been placed if not sampledAikens Creek Bridge Deck Overhang
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-07-28-28
DIME Test ID: 2023-07-28-28-3
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2023-08-25

Test Results


Input Type: Calculated
Tester's full name: Joe Pedroni
Date of test: 07/28/2023
Temperature: 84 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/2/2023