Summary for Test 2023-07-21-32-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 214336 DEA: 07302404 EFIS: 0713000488 |
---|---|
DIST-CO-RTE-PM | 07-VEN-101-37/40 |
Award Date | 11/17/2020 |
Closeout Date | 09/24/2024 |
Work Description | PADRE JUAN REHAB |
Location Description | VEN 101 |
QA Service Level | 1 (Verified on 02/26/2021) |
Sample Information
Sample Taken Date | 07/21/2023 | Sample Unique Key | 32 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/21/2023 |
Sample type | Quality Assurance | A brief description of the sample | Class 3 Aggregate Base |
The quantity of what the sample constitutes | 13000 sqft | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Marcus | Last name of sampler or witnessed by | Molina |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 23-1108 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | n/a | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | n/a |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-07-21-32
DIME Test ID: 2023-07-21-32-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-07-26
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Marcus Molina
Date of test: 07/21/2023
Gage No.: 6060
Test No.: 1
Nuclear By: Marcus Molina
Non-Bias Plan No.: 2
Depth: 7
Material No.: Aggregate Base
Material Type: Class 3 Aggregate Base
Impact By: Marcus Molina
Standard Count Density: 30352 g/cc
Count or Density 1: 26080 g/cc
Count or Density 2: 24480 g/cc
Count or Density 3: 26444 g/cc
Count or Density 4: 26584 g/cc
Count or Density 5: 25484 g/cc
Standard Count Moisture: 9592 g/cc
Moisture Count 1: 2260 g/cc
Moisture Count 2: 2396 g/cc
Moisture Count 3: 2368 g/cc
Moisture Count 4: 2300 g/cc
Moisture Count 5: 2296 g/cc
Sum of Count or Density: 129072.00 g/cc
Average of Count or Density: 25814.00 g/cc
Sum of Moisture Count: 11620.00 g/cc
Average of Moisture Count: 2324.00 g/cc
Count Ratio Density: 0.85
Count Ratio Moisture: 0.24
Calculated Percent Relative Compaction: 96.5 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/26/2023 ✔