Summary for Test 2023-05-17-74-1

Test performed: CTM 208-September 2011

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award DateNot set
Closeout DateNot set
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date05/17/2023 Sample Unique Key74
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/01/2023
Sample typeVerification A brief description of the sample1 Bag of Hi-Natural
The quantity of what the sample constitutes1 Bag of Hi-Natural Crumb Rubber From where was the sample collectedManufacturer
First name of sampler or witnessed byThomas Last name of sampler or witnessed by Shivens QC
Title of sampler Telephone number of sampler
Laboratory sample identification0286G-23 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Materials Sun Valley Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeCrumb Rubber Modifier CRM TypeHigh Natural
Crumb Rubber Modifier Mix Number326120 SVA3 LTR

Test Details

DIME Sample ID: 2023-05-17-74
DIME Test ID: 2023-05-17-74-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 208-September 2011: Method of Test for Apparent Specific Gravity of Fine Aggregates
Test Release Date: 2023-09-07

Test Results


Input Type: Calculated
Tester's full name: Zaid.A
Date of test: 06/03/2023
Specific Gravity: 1.19
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/7/2023