Summary for Test 2023-07-19-3-1
Test performed: CTM 216-June 2011Project Information
Project Identifiers | Project ID: 994399 DEA: 09378704 EFIS: 0919000001 |
---|---|
DIST-CO-RTE-PM | 09-MNO-395-55.5/58.2 |
Award Date | 12/22/2022 |
Closeout Date | 12/22/2023 |
Work Description | PARTIAL DEPTH RECYCLE AND HMA (TYPE A). |
Location Description | MONO COUNTY NEAR LEE VINING FROM 0.2 MILE SOUTH OF CEMETERY ROAD TO ROUTE 167 |
QA Service Level | 1 (Verified on 07/31/2023) |
Sample Information
Sample Taken Date | 07/19/2023 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/19/2023 |
Sample type | Department Acceptance | A brief description of the sample | 3/4" Class II AB |
The quantity of what the sample constitutes | 1 bag of soil | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jeff | Last name of sampler or witnessed by | Puente |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | AB-01 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Granite | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Station 128535 129500 | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-07-19-3
DIME Test ID: 2023-07-19-3-1
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2023-07-19
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 07/19/2023
In-place wet density: 2.15
Highest adjust wet density: 2.3
% Moisture: 18.0 %
Optimum Moisture: 20.0 %
Relative compaction: 93
General comments (publicly viewable) (Max 1000 characters): AB-1
Test was verified on 7/19/2023 ✔