Summary for Test 2023-05-30-55-2

Test performed: ASTM C143-20

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date05/30/2023 Sample Unique Key55
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/01/2023
Sample typeQuality Assurance A brief description of the samplePCC
The quantity of what the sample constitutes3 CY From where was the sample collectedJob Site
First name of sampler or witnessed byJesse Last name of sampler or witnessed byGomez
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMartin Marrieta, Goleta Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number725A1Z0P
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected3433515
Concrete batch plantMartin Marietta The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-05-30-55
DIME Test ID: 2023-05-30-55-2
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2023-07-17

Test Results


Input Type: Measured
Tester's full name: Jesse Gomez
Date of test: 05/30/2023
Slump: 5.75 inch
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/17/2023