Summary for Test 2023-05-19-96-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 993184 DEA: 040A7724 EFIS: 0420000288 COOP: 042763 |
---|---|
DIST-CO-RTE-PM | 04-ALA-80-6.4/6.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Excavation, HMA, structural concrete, minor concrete and drainage. |
Location Description | IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD |
QA Service Level | 1 (Verified on 04/08/2022) |
Sample Information
Sample Taken Date | 05/19/2023 | Sample Unique Key | 96 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 07/19/2023 |
Sample type | Quality Control | A brief description of the sample | 3/8 Pea Gravel |
The quantity of what the sample constitutes | 3 bags 25Ibs ea | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Kwangkyum | Last name of sampler or witnessed by | Lee |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Central Concrete | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-01-0010 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Staircase CID pile at bent 1 on west side | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | DDJ118E3 | Lot number | |
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-05-19-96
DIME Test ID: 2023-05-19-96-1
Testing Lab: Golden State Bridge, Incorporated
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-08-14
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Josh Sircy
Date of test: 05/25/2023
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 84 %
Cumulative percent passing the #4 sieve: 13 %
Cumulative percent passing the #8 sieve: 1 %
Cumulative percent passing the #16 sieve: 0 %
Cumulative percent passing the #30 sieve: 0 %
Cumulative percent passing the #50 sieve: 0 %
Cumulative percent passing the #100 sieve: 0 %
Cumulative percent passing the #200 sieve: 0 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
---|---|---|---|---|---|
5.19.23 - PCDC - Aggregate Report _ Staircase CIDH pile at bent 1 (West side) | 585.75 KB | 07/10/2023 | 2023-05-19-96-1 | Info |
Test was verified on 8/14/2023 ✔