Summary for Test 2023-07-06-13-1

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Sample Information

Sample Taken Date07/06/2023 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/06/2023
Sample typeQuality Assurance A brief description of the sample1/2" RHMA-G
The quantity of what the sample constitutes1200 tons From where was the sample collectedManufacturer
First name of sampler or witnessed byKreetha Last name of sampler or witnessed byMekchai
Title of samplerQA Inspector Telephone number of sampler6265327705
Laboratory sample identification23-0635 Linked DIME Sample ID23-0635
The fabricator/manufacturer/facility nameAAA-Corona Transportation Laboratory (TL) Number23-0635
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameOC 405 SB Brookhurst to Harbor

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading1/2 inch Lot number
Sublot number HMA Mix Number106836

Test Details

DIME Sample ID: 2023-07-06-13
DIME Test ID: 2023-07-06-13-1
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2023-07-07

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Kreetha Mekchai
Date of test: 07/06/2023
Cumulative percent passing the 2 in. sieve: 0 %
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 0 %
Cumulative percent passing the 3/4 in. sieve: 0 %
Cumulative percent passing the 1/2 in. sieve: 91 %
Cumulative percent passing the 3/8 in. sieve: 79 %
Cumulative percent passing the #4 sieve: 37 %
Cumulative percent passing the #8 sieve: 17 %
Cumulative percent passing the #16 sieve: 11 %
Cumulative percent passing the #30 sieve: 7 %
Cumulative percent passing the #50 sieve: 5 %
Cumulative percent passing the #100 sieve: 4 %
Cumulative percent passing the #200 sieve: 3.1 %
General comments (publicly viewable) (Max 1000 characters):

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
20230706_120H1004_23-0635_HMA LabReportpdf119.00 KB07/07/20232023-07-06-13-1   Info

Test was verified on 7/7/2023