Summary for Test 2023-06-20-8-1
Test performed: AASHTO T176-08Project Information
Project Identifiers | Project ID: 994399 DEA: 09378704 EFIS: 0919000001 |
---|---|
DIST-CO-RTE-PM | 09-MNO-395-55.5/58.2 |
Award Date | 12/22/2022 |
Closeout Date | 12/22/2023 |
Work Description | PARTIAL DEPTH RECYCLE AND HMA (TYPE A). |
Location Description | MONO COUNTY NEAR LEE VINING FROM 0.2 MILE SOUTH OF CEMETERY ROAD TO ROUTE 167 |
QA Service Level | 1 (Verified on 07/31/2023) |
Sample Information
Sample Taken Date | 06/20/2023 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/21/2023 |
Sample type | Verification | A brief description of the sample | 3/4" Coldfeed & RAP |
The quantity of what the sample constitutes | 3 Bags of Aggregate | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Josh | Last name of sampler or witnessed by | Hubartt |
Title of sampler | TET | Telephone number of sampler | 7609373217 |
Laboratory sample identification | JMF 3 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Granite Lee Vining | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-26-0029 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Sample Device at Hot Plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-06-20-8
DIME Test ID: 2023-06-20-8-1
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2023-06-29
Test Results
How many times will the test be run?: 3 Times
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 06/21/2023
Sand Equivalent (Test 1): 78
Sand Equivalent (Test 2): 80
Sand Equivalent (Test 3): 76
Sand Equivalent: 78
General comments (publicly viewable) (Max 1000 characters): JMF-03
Test was verified on 6/29/2023 ✔