Summary for Test 2023-06-21-6-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 994144
DEA: 060W15V4
EFIS: 0619000107
DIST-CO-RTE-PM06-KER-58,204-R53.4/R54.5,R0.0/4.6
Award Date10/06/2022
Closeout DateNot set
Work DescriptionMODIFY SIGNAL AND LIGHTING SYSTEMS AND REPLACE CURB RAMPS.
Location DescriptionKERN COUNTY IN BAKERSFIELD ON ROUTE 58 FROM SOUTH H STREET OVERCROSSING TO ROUTE 204 AND ON ROUTE 204 FROM ROUTE 58/204 SEPARATION TO L STREET
QA Service Level1 (Verified on 07/28/2022)

Sample Information

Sample Taken Date06/21/2023 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/21/2023
Sample typeAcceptance A brief description of the sampleNative Soil
The quantity of what the sample constitutes40 lbs class 2 AB From where was the sample collectedJob Site
First name of sampler or witnessed byNeale Last name of sampler or witnessed byBrown
Title of samplerMaterials Tester Telephone number of sampler6615498281
Laboratory sample identification8 Linked DIME Sample ID
The fabricator/manufacturer/facility namenone Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedTest holes at jobsite
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2023-06-21-6
DIME Test ID: 2023-06-21-6-2
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-06-21

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Neale Brown
Date of test: 06/21/2023
Gage No.: 30699
Test No.: 8
Nuclear By: Neale Brown
Non-Bias Plan No.: 4- odd
Depth: 8
Material No.: no data
Material Type: Class 2 AB
Impact By: Neale Brown
Standard Count Density: 1946 g/cc
Count or Density 1: 1063 g/cc
Count or Density 2: 1049 g/cc
Count or Density 3: 1059 g/cc
Standard Count Moisture: 620 g/cc
Moisture Count 1: 145 g/cc
Moisture Count 2: 118 g/cc
Moisture Count 3: 126 g/cc
Sum of Count or Density: 3171.00 g/cc
Average of Count or Density: 1057.00 g/cc
Sum of Moisture Count: 389.00 g/cc
Average of Moisture Count: 130.00 g/cc
Count Ratio Density: 0.54
Count Ratio Moisture: 0.21
Calculated Percent Relative Compaction: 98.1 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters): Curb Ramp # 7 roadway section elevation: Finished base width : 2 ft length 50 ft probe 8"

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
06-0W15V4_3700_230621_8pdf107.48 KB06/21/20232023-06-21-6-2   Info

Test was verified on 6/21/2023