Summary for Test 2023-05-31-72-3
Test performed: ASTM D5329-16Project Information
Project Identifiers | Project ID: 993159 DEA: 08323034 EFIS: 0812000059 COOP: 081703 |
---|---|
DIST-CO-RTE-PM | 08-RIV-60-18.8/19.6 |
Award Date | 05/04/2021 |
Closeout Date | Not set |
Work Description | Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configuration |
Location Description | SR-60 & Moreno Beach Interchange |
QA Service Level | 2 (Verified on 07/27/2021) |
Sample Information
Sample Taken Date | 05/31/2023 | Sample Unique Key | 72 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/16/2023 |
Sample type | Verification | A brief description of the sample | Asphalt Rubber Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Capacete |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0322-23 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | All American-Perris | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
---|---|---|---|
Performance Grade | PG 64-16 | Lot number | |
Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2023-05-31-72
DIME Test ID: 2023-05-31-72-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2023-06-22
Test Results
Input Type: Calculated
Tester's full name: Sm Ali
Date of test: 06/20/2023
Temperature: 25 C
Final Dial reading (F1): 74 mm
Ball Penetration (P1): 0 mm
Final Dial reading (F2): 74 mm
Ball Penetration (P2): 0 mm
Final Dial reading (F3): 74 mm
Ball Penetration (P3): 0 mm
Resilience 1: 26 %
Resilience 2: 26 %
Resilience 3: 26 %
Average Resilience: 26 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/22/2023 ✔