Summary for Test 2023-06-15-10-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 215420 DEA: 060R2104 EFIS: 0614000058 |
---|---|
DIST-CO-RTE-PM | 06-MAD-41-6.2/9.2 |
Award Date | 01/18/2023 |
Closeout Date | Not set |
Work Description | FOR CONSTRUCTION ON STATE HIGHWAY IN MADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE |
Location Description | MADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE |
QA Service Level | 1 (Verified on 01/06/2021) |
Sample Information
Sample Taken Date | 06/15/2023 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/16/2023 |
Sample type | Verification | A brief description of the sample | Structural Backfill |
The quantity of what the sample constitutes | 50 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Noah | Last name of sampler or witnessed by | Hunt |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Unknown | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-20-0016 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Jobsite Stockpile | |
Where the material sample would have been placed if not sampled | drainage System | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-06-15-10
DIME Test ID: 2023-06-15-10-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-06-16
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Measured
Tester's full name: Allen Oliver
Date of test: 06/16/2023
Cumulative Mass Retained | Cumulative Percent Passing | |||||
---|---|---|---|---|---|---|
10098 grams | ||||||
0 grams | 100 % | |||||
0 grams | 100 % | |||||
0 grams | 100 % | |||||
0 grams | 100 % | |||||
0 grams | 100 % | |||||
370 grams | 96 % | |||||
978 grams | 90 % | |||||
1344 grams | 87 % | |||||
2323 grams | 77 % | |||||
519 grams | ||||||
67 grams | 67 % | |||||
143 grams | 56 % | |||||
225 grams | 44 % | |||||
306 grams | 32 % | |||||
386 grams | 20 % | |||||
442.5 grams | 11 % |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/16/2023 ✔