Summary for Test 2023-06-13-41-3

Test performed: ASTM C1064-17
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 994441
DEA: 081A8304
EFIS: 0800000579
COOP: 081746
DIST-CO-RTE-PM08---
Award Date10/05/2022
Closeout DateNot set
Work DescriptionWidening the existing Cedar Avenue overcrossing (OC) from 6 to 10 lanes, replacing the Union Pacific Railroad overhead (OH), widening Cedar Avenue from 4 to 6 through lanes, and realigning and/or widening the interchange entrance and exit ramps
Location DescriptionAt the Interstate 10 (I-10) Cedar Avenue Interchange from PM 17.8 to 19.3 in the County of San Bernardino (County)
QA Service Level2 (Verified on 12/13/2022)

Sample Information

Sample Taken Date06/13/2023 Sample Unique Key41
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/14/2023
Sample typeQuality Control A brief description of the sampleBed 1B, 4th Truck
The quantity of what the sample constitutes1 CF of Concrete for Testing From where was the sample collectedManufacturer
First name of sampler or witnessed byMark Patrick Last name of sampler or witnessed byBaddu
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCon-Fab California, LLC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberVER-98LV
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected8729
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 1B, 4th Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-06-13-41
DIME Test ID: 2023-06-13-41-3
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2023-06-16

Test Results


Input Type: Calculated
Tester's full name: PJ Wright
Date of test: 06/15/2023
Temperature: 75 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/16/2023

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.