Summary for Test 2023-06-13-41-3
Test performed: ASTM C1064-17
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
Project Identifiers | Project ID: 994441 DEA: 081A8304 EFIS: 0800000579 COOP: 081746 |
---|---|
DIST-CO-RTE-PM | 08--- |
Award Date | 10/05/2022 |
Closeout Date | Not set |
Work Description | Widening the existing Cedar Avenue overcrossing (OC) from 6 to 10 lanes, replacing the Union Pacific Railroad overhead (OH), widening Cedar Avenue from 4 to 6 through lanes, and realigning and/or widening the interchange entrance and exit ramps |
Location Description | At the Interstate 10 (I-10) Cedar Avenue Interchange from PM 17.8 to 19.3 in the County of San Bernardino (County) |
QA Service Level | 2 (Verified on 12/13/2022) |
Sample Information
Sample Taken Date | 06/13/2023 | Sample Unique Key | 41 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/14/2023 |
Sample type | Quality Control | A brief description of the sample | Bed 1B, 4th Truck |
The quantity of what the sample constitutes | 1 CF of Concrete for Testing | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Mark Patrick | Last name of sampler or witnessed by | Baddu |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | VER-98LV |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 8729 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Bed 1B, 4th Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-06-13-41
DIME Test ID: 2023-06-13-41-3
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2023-06-16
Test Results
Input Type: Calculated
Tester's full name: PJ Wright
Date of test: 06/15/2023
Temperature: 75 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/16/2023 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.