Summary for Test 2023-05-09-92-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 993607
DEA: 07322604
EFIS: 0716000057
DIST-CO-RTE-PM07-LA-210-R41.3/R44.6
Award DateNot set
Closeout DateNot set
Work DescriptionCONSTRUCT POLLUTION INFILTRATION AREAS AND AUSTIN VAULT SAND FILTER.
Location DescriptionLOS ANGELES COUNTY IN GLENDORA AT VARIOUS LOCATIONS FROM 0.2 MILE EAST OF BARRANCA AVENUE OVERCROSSING TO 0.1 MILE WEST OF AMELIA AVENUE UNDERCROSSING
QA Service Level1 (Verified on 05/11/2022)

Sample Information

Sample Taken Date05/09/2023 Sample Unique Key92
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/09/2023
Sample typeQuality Assurance A brief description of the sampleAggregate Base
The quantity of what the sample constitutes336 sqft From where was the sample collectedJob Site
First name of sampler or witnessed byDominic Last name of sampler or witnessed byMontemayor
Title of sampler Telephone number of sampler
Laboratory sample identification23-0569 Linked DIME Sample ID
The fabricator/manufacturer/facility namen/a Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)n/a
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-05-09-92
DIME Test ID: 2023-05-09-92-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-05-18

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 05/09/2023
Gage No.: 6901
Test No.: 1
Nuclear By: Dominic Montemayor
Non-Bias Plan No.: 10
Depth: 7
Material No.: Aggregate Base
Material Type: Aggregate Base
Impact By: Dominic Montemayor
Standard Count Density: 8875 g/cc
Count or Density 1: 8599 g/cc
Count or Density 2: 8911 g/cc
Count or Density 3: 9141 g/cc
Standard Count Moisture: 19287 g/cc
Moisture Count 1: 3886 g/cc
Moisture Count 2: 3500 g/cc
Moisture Count 3: 3613 g/cc
Sum of Count or Density: 26651.00 g/cc
Average of Count or Density: 8884.00 g/cc
Sum of Moisture Count: 10999.00 g/cc
Average of Moisture Count: 3666.00 g/cc
Count Ratio Density: 1.00
Count Ratio Moisture: 0.19
Calculated Percent Relative Compaction: 95.9 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/18/2023