Summary for Test 2023-05-16-20-2
Test performed: CTM 518-June 2010Project Information
Project Identifiers | Project ID: 215180 DEA: 060Q9204 EFIS: 0614000010 COOP: 061764 |
---|---|
DIST-CO-RTE-PM | 06-KER-99-10.4/21.2 |
Award Date | 12/08/2020 |
Closeout Date | Not set |
Work Description | CONSTRUCT CRCP AND HMA (TYPE A) PAVEMENT. |
Location Description | KERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.4 MILE SOUTH OF OLD US 99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING |
QA Service Level | 1 (Verified on 09/14/2020) |
Sample Information
Sample Taken Date | 05/16/2023 | Sample Unique Key | 20 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/17/2023 |
Sample type | Department Acceptance | A brief description of the sample | CRCP -12 field curing and 4 standard curing beams set #2 |
The quantity of what the sample constitutes | 1040CY load # 140 | From where was the sample collected | Source |
First name of sampler or witnessed by | James | Last name of sampler or witnessed by | Watson |
Title of sampler | Telephone number of sampler | 6615498281 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Hwy 223 off ramp sb 99 | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | G3-21-PCC-263 |
---|---|---|---|
The truck number from where the sample was collected | 18 | The batch plant ticket number from where the sample was collected | 304 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-05-16-20
DIME Test ID: 2023-05-16-20-2
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2023-05-17
Test Results
Input Type: Measured
Tester's full name: James Watson
Date of test: 05/17/2023
Calibration factor: 4
Weight of (Measure + Concrete + Cover Plate): 45.12 lb
Weight of (Measure + Cover Plate): 8.58 lb
Total weight of cement: 5890 lb
Total weight of fine aggregate: 12687 lb
Total weight of coarse aggregate: 18580 lb
Total weight of water added during mixing: 2823.96 lb
Kelly Ball Penetration of the batch of concrete tested: 1 inch
Air content by the pressure method: 3.5 %
Station number or portion of the structure in which the concrete was placed: 89+30
Net weight of concrete: 36.54 lb
Total weight of all material in the mix: 39981 lb
Volume of the concrete: 10.131 yd^3
Unit weight of the concrete: 146.16 lb/ft^3
Cement content: 581.384 lb/yd^3
General comments (publicly viewable) (Max 1000 characters): P-3 12 field and 4 standard curing beams beam #2 date of pour 5/16/23 nighttime. Beam #26 and #27
Test was verified on 5/17/2023 ✔