Summary for Test 2023-05-13-2-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 215100
DEA: 071XP904
EFIS: 0720000158
DIST-CO-RTE-PM07-LA-118-R5.75, R5.75/R5.75, 5.75/5.75
Award Date07/30/2020
Closeout Date10/02/2023
Work DescriptionREPAIR FAILED DRAINAGE SYSTEM ON LA COUNTY W/B LA-118 RESEDA BLVD
Location DescriptionW/B LA-118 RESEDA BLVD
QA Service Level1 (Verified on 06/30/2021)

Sample Information

Sample Taken Date05/13/2023 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/13/2023
Sample typeAcceptance A brief description of the sampleEmbankment
The quantity of what the sample constitutes270 CY From where was the sample collectedJob Site
First name of sampler or witnessed byJacinto Last name of sampler or witnessed byVillanueva
Title of samplerTEC Telephone number of sampler8182096574
Laboratory sample identification23-0622 Linked DIME Sample ID
The fabricator/manufacturer/facility nameOrnelas Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleembankment
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedfrom varioyus locations at embankment
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2023-05-13-2
DIME Test ID: 2023-05-13-2-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-05-14

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 05/13/2023
Gage No.: 60247
Test No.: 2
Nuclear By: jacinto villanueva
Non-Bias Plan No.: 7
Depth: 12 Inches
Material No.: on site
Material Type: embankment
Impact By: jacinto villanueva
Standard Count Density: 2.02 g/cc
Count or Density 1: 2.05 g/cc
Count or Density 2: 1.99 g/cc
Count or Density 3: 2.021 g/cc
Standard Count Moisture: 644 g/cc
Moisture Count 1: 0.25 g/cc
Moisture Count 2: 0.25 g/cc
Moisture Count 3: 0.25 g/cc
Sum of Count or Density: 6.06 g/cc
Average of Count or Density: 2.02 g/cc
Sum of Moisture Count: 0.75 g/cc
Average of Moisture Count: 0.25 g/cc
Calculated Percent Relative Compaction: 92.2 %
Reported Percent Relative Compaction: 92 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/14/2023