Summary for Test 2023-05-09-40-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 212880
DEA: 050F9704
EFIS: 0513000017
DIST-CO-RTE-PM05-MON-101-62.7
Award Date03/17/2022
Closeout Date02/14/2024
Work DescriptionN. SOLEDAD OH DECK REPLACEMENT
Location DescriptionON RTE 101 IN MONTEREY COUNTY NEAR SOLEDAD AT THE NORTH SOLEDAD OH BRIDGE BR 44-0091L/R
QA Service Level1 (Verified on 09/30/2019)

Sample Information

Sample Taken Date05/09/2023 Sample Unique Key40
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/09/2023
Sample typeDepartment Acceptance A brief description of the sampleBRIDGE
The quantity of what the sample constitutesskid testing From where was the sample collectedJob Site
First name of sampler or witnessed byHARISH Last name of sampler or witnessed byTHAKUR
Title of sampler Telephone number of sampler4152464791
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSOLEDAD Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameN SOLEDAD OH

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Test Details

DIME Sample ID: 2023-05-09-40
DIME Test ID: 2023-05-09-40-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-05-10

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 05/09/2023
Air Temperature: 51
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: NIGHT/WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: RIGHT OF WALL
Reference Distance 1: 148
Reference Distance 2: 151
Reference Distance 3: 154
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 9
Position for Stationing 2: 9
Position for Stationing 3: 9
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.46
Corrected Coefficients of Friction for Stationing 2: 0.44
Corrected Coefficients of Friction for Stationing 3: 0.44
Average Coefficient of Friction: 0.45
General comments (publicly viewable) (Max 1000 characters): BRIDGE

Test was verified on 5/10/2023