Summary for Test 2023-05-09-22-3
Test performed: ASTM C1064-17Project Information
Project Identifiers | Project ID: 215396 DEA: 042K8404 EFIS: 0417000031 |
---|---|
DIST-CO-RTE-PM | 04-SOL-29,80-0.0,0.8/1.6 |
Award Date | 03/26/2021 |
Closeout Date | 02/16/2024 |
Work Description | HMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR. |
Location Description | SOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/25/2021) |
Sample Information
Sample Taken Date | 05/09/2023 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 05/10/2023 |
Sample type | Quality Assurance | A brief description of the sample | Stage 3 Type 836 barrier |
The quantity of what the sample constitutes | 21 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Nestor Angelo | Last name of sampler or witnessed by | Perez |
Title of sampler | SR | Telephone number of sampler | 5103939319 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Central Plant Martinez | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 23-0259 | |
Structure name | Route 80/29 Separation |
Material Information
Material Type | Concrete | The concrete mix design number | D20115EA |
---|---|---|---|
The truck number from where the sample was collected | 4 | The batch plant ticket number from where the sample was collected | 335801 |
Concrete batch plant | Central Plant Martinez | The fabricator/manufacturer designation for the sample | |
A detailed description of where the material sample was collected | Concrete from wheelbarrow | Where the material sample would have been placed if not sampled | Stage 3 Type 836 barrier |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-05-09-22
DIME Test ID: 2023-05-09-22-3
Testing Lab: CT D04 - Fairfield Construction Field Office 59-545
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2023-05-10
Test Results
Input Type: Measured
Tester's full name: Nestor Angelo Perez
Date of test: 05/09/2023
Temperature: 67 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/10/2023 ✔