Summary for Test 2023-04-14-46-1

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 215005
DEA: 044J7504
EFIS: 0416000005
DIST-CO-RTE-PM04-ALA-84-R0.73/3.06
Award Date07/07/2022
Closeout DateNot set
Work DescriptionINSTALL OUTER SEPARATION BARRIERS Concrete barrier, shoulder widening, striping, cold plane and overlay.
Location DescriptionALAMEDA COUNTY IN FREMONT FROM 0.7 MILE NORTH OF SAN MATEO COUNTY LINE TO 0.1 MILE SOUTH OF TOLL PLAZA
QA Service Level1 (Verified on 10/19/2020)

Sample Information

Sample Taken Date04/14/2023 Sample Unique Key46
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/17/2023
Sample typeQuality Assurance A brief description of the sample3/4 HMA + 15% RAP
The quantity of what the sample constitutes500 Tons From where was the sample collectedJob Site
First name of sampler or witnessed byJohn Last name of sampler or witnessed byTran
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMartin Marietta - Sunol Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number3 HMA Mix NumberL200271V

Test Details

DIME Sample ID: 2023-04-14-46
DIME Test ID: 2023-04-14-46-1
Testing Lab: CT D04 - Hayward Field Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2023-05-03

Test Results


Number of tests: 2
Input Type: Measured
Tester's full name: Luis Magana
Date of test: 04/19/2023
123
2.405 2.387
2.5

3.8 %

4.5 %

4.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/3/2023