Summary for Test 2023-04-20-11-1
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 212737 DEA: 060S8304 EFIS: 0615000046 |
---|---|
DIST-CO-RTE-PM | 06-FRE-5-44.4-45.4 |
Award Date | 05/26/2022 |
Closeout Date | Not set |
Work Description | TUMEY GULCH ABUTMENT REHAB BR# 42-0246L/R. |
Location Description | IN FRESNO COUNTY AT TUMEY GULCH. |
QA Service Level | 1 (Verified on 09/25/2018) |
Sample Information
Sample Taken Date | 04/20/2023 | Sample Unique Key | 11 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/20/2023 |
Sample type | Department Acceptance | A brief description of the sample | Skid Portable |
The quantity of what the sample constitutes | Skid Testing | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jessie | Last name of sampler or witnessed by | Wilson |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Job Site | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
---|---|---|---|
Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
Direction of Travel | Not set | Post Mile | Not set |
Lanes to be Tested | Not set | Station | Not set |
Test Details
DIME Sample ID: 2023-04-20-11
DIME Test ID: 2023-04-20-11-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-04-21
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 04/20/2023
Air Temperature: 64 F
Tire Pressure: 24 psi
Equipment PST #: 1000-9
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of right bridge wall
Reference Distance 1: 28 ft
Reference Distance 2: 31 ft
Reference Distance 3: 34 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 16 ft
Position for Stationing 2: 16 ft
Position for Stationing 3: 16 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.35
Corrected Coefficients of Friction for Stationing 2: 0.36
Corrected Coefficients of Friction for Stationing 3: 0.36
Average Coefficient of Friction: 0.36
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/21/2023 ✔