Summary for Test 2023-04-05-33-3

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 993493
DEA: 100Q1224
EFIS: 1014000168
DIST-CO-RTE-PM10-MER-99-28.2/R37.3
Award Date03/30/2022
Closeout DateNot set
Work DescriptionWIDEN CONCRETE PAVEMENT LANES AND BRIDGES.
Location DescriptionMERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUE OVERCROSSING TO STANISLAUS COUNTY LINE
QA Service Level1 (Verified on 01/10/2022)

Sample Information

Sample Taken Date04/05/2023 Sample Unique Key33
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/05/2023
Sample typeQuality Assurance A brief description of the sample3/4 HMA
The quantity of what the sample constitutes4 boxes From where was the sample collectedManufacturer
First name of sampler or witnessed byTimothy Last name of sampler or witnessed byTretz
Title of samplerLab Technician Telephone number of sampler
Laboratory sample identification23-H-33 Linked DIME Sample ID
The fabricator/manufacturer/facility nameSanta Fe Winton Transportation Laboratory (TL) Number7721753
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number1 HMA Mix Number22J24A

Test Details

DIME Sample ID: 2023-04-05-33
DIME Test ID: 2023-04-05-33-3
Testing Lab: CT D10 - District 10 Materials Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2023-04-13

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Darrius Shuemake
Date of test: 04/07/2023
Percent Air Voids: 4.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/13/2023