Summary for Test 2023-03-27-28-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 993141
DEA: 060V1204
EFIS: 0616000207
DIST-CO-RTE-PM06-MAD-99-R6.9/R7.6
Award Date06/22/2022
Closeout DateNot set
Work DescriptionCottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS.
Location DescriptionMADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING
QA Service Level1 (Verified on 07/28/2021)

Sample Information

Sample Taken Date03/27/2023 Sample Unique Key28
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/27/2023
Sample typeDepartment Acceptance A brief description of the sampleDetour sub base
The quantity of what the sample constitutes2000 SQYD From where was the sample collectedJob Site
First name of sampler or witnessed byNoah Last name of sampler or witnessed byHunt
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameNative Material Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedDetour
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2023-03-27-28
DIME Test ID: 2023-03-27-28-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-03-30

Test Results


Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Allen Oliver
Date of test: 03/27/2023
Sum of Count or Density: 5000.00 g/cc
Average of Count or Density: 1000.00 g/cc
Sum of Moisture Count: 750.00 g/cc
Average of Moisture Count: 150.00 g/cc
Count Ratio Density: 0.50
Count Ratio Moisture: 0.24
Calculated Percent Relative Compaction: 97.7 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters): Max = 2.24

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
IMG_0367JPG4878.29 KB03/30/20232023-03-27-28-1   Info

Test was verified on 3/30/2023