Summary for Test 2023-03-06-33-2
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 214951 DEA: 120K0234 EFIS: 1214000100 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-17.1/18.9 |
Award Date | 09/23/2020 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/01/2020) |
Sample Information
Sample Taken Date | 03/06/2023 | Sample Unique Key | 33 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/28/2023 |
Sample type | Verification | A brief description of the sample | PG Asphalt Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | David | Last name of sampler or witnessed by | Nguyen |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0184-23 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | AAA-Irvine | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2023-03-06-33
DIME Test ID: 2023-03-06-33-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-04-30
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 03/30/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.270 grams
Mass of empty container #2: 169.566 grams
Mass of container #1 before test (m1i): 202.068 grams
Mass of container #2 before test (m2i): 204.364 grams
Mass of container #1 after test (m1f): 202.021 grams
Mass of container #2 after test (m2f): 204.319 grams
Average mass change: -0.132 percent
General comments (publicly viewable) (Max 1000 characters): - 0.132 + 0.006 = - 0.126
Test was verified on 4/30/2023 ✔