Summary for Test 2023-03-18-18-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 994087
DEA: 051G4104
EFIS: 0515000012
DIST-CO-RTE-PM05-SB-101-4.0/4.8
Award Date08/01/2022
Closeout DateNot set
Work DescriptionSanta Claus Lane Bike Path - !!Charge time to 05-0N72U4 per Project Manager / Corridor Manager!!
Location Description!!Charge time to 05-0N72U4 per Project Manager / Corridor Manager!!
QA Service Level1 (Verified on 07/25/2022)

Sample Information

Sample Taken Date03/18/2023 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/22/2023
Sample typeAcceptance A brief description of the samplePCC Aggregates
The quantity of what the sample constitutes38 CY From where was the sample collectedSupplier
First name of sampler or witnessed byDarren Last name of sampler or witnessed byLaChaine
Title of sampler Telephone number of sampler8056213616
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMartin Marietta Goleta Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-42-0003
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedConveyor Belt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design number725A1Z0P Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-03-18-18
DIME Test ID: 2023-03-18-18-1
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-03-23

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Jesse Gomez
Date of test: 03/22/2023
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 96 %
Cumulative percent passing the #8 sieve: 87 %
Cumulative percent passing the #16 sieve: 76 %
Cumulative percent passing the #30 sieve: 53 %
Cumulative percent passing the #50 sieve: 23 %
Cumulative percent passing the #100 sieve: 5 %
Cumulative percent passing the #200 sieve: 2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/23/2023