Summary for Test 2023-03-08-46-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 994408
DEA: 051K03U4
EFIS: 0522000026
DIST-CO-RTE-PM05-SLO-101-
Award Date10/04/2022
Closeout DateNot set
Work Description!!PLEASE CC Office Engineer Barbara Riccardi on reports to RE and SR!! Construct 2 roundabouts in Montecito along US 101.
Location DescriptionNot set
QA Service Level1 (Verified on 12/29/2022)

Sample Information

Sample Taken Date03/08/2023 Sample Unique Key46
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/13/2023
Sample typeQuality Assurance A brief description of the sample1.15x4x6" LAM PAD w2 14ga SHIMS
The quantity of what the sample constitutes9 From where was the sample collectedManufacturer
First name of sampler or witnessed byBrad Last name of sampler or witnessed byStreeter
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameScougal Rubber Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)22802-1-2
Material/Compound/Elastomer IDNA Samples Representing9
Description (size)1.15 x 4 x 6 Comments
Description (Number of Shims)2 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch NumberNA

Test Details

DIME Sample ID: 2023-03-08-46
DIME Test ID: 2023-03-08-46-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2023-03-20

Test Results


Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 03/20/2023
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/20/2023