Summary for Test 2023-01-26-79-3

Test performed: ASTM C231-17a

Project Information

Project IdentifiersProject ID: 993333
DEA: 04264724
EFIS: 0419000068
DIST-CO-RTE-PM04-MRN-101-R20.8/27.1
Award Date04/26/2022
Closeout DateNot set
Work DescriptionCIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location DescriptionMARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
QA Service Level1 (Verified on 11/01/2021)

Sample Information

Sample Taken Date01/26/2023 Sample Unique Key79
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/27/2023
Sample typeQuality Control A brief description of the sample3728LV
The quantity of what the sample constitutes54 From where was the sample collectedSupplier
First name of sampler or witnessed byRoland Last name of sampler or witnessed byOcansey
Title of samplerLab Technician Telephone number of sampler
Laboratory sample identification22-078 Linked DIME Sample ID
The fabricator/manufacturer/facility nameShamrock Materials Petaluma Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameOlive Bridge Abutment Closure and Wingwalls

Material Information

Material TypeConcrete The concrete mix design number3728LV
The truck number from where the sample was collected1465 The batch plant ticket number from where the sample was collected431322
Concrete batch plantShamrock Petaluma The fabricator/manufacturer designation for the sample3728LV
A detailed description of where the material sample was collectedPLANT Where the material sample would have been placed if not sampledconcrete
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-01-26-79
DIME Test ID: 2023-01-26-79-3
Testing Lab: Pavement Engineers
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-03-01

Test Results


Is wet sieving required?: No
Input Type: Calculated
Tester's full name: Cameron Carlson
Date of test: 01/26/2023
Air content: 2.1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/1/2023