Summary for Test 2023-03-01-1-1
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 99999 DEA: 0322222 |
---|---|
DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
QA Service Level | (Verified on 04/05/2013) |
Sample Information
Sample Taken Date | 03/01/2023 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/01/2023 |
Sample type | Department Acceptance | A brief description of the sample | Portable Skid Test |
The quantity of what the sample constitutes | na | From where was the sample collected | Job Site |
First name of sampler or witnessed by | H | Last name of sampler or witnessed by | T |
Title of sampler | boss | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | na | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
---|---|---|---|
Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
Direction of Travel | Not set | Post Mile | Not set |
Lanes to be Tested | Not set | Station | Not set |
Test Details
DIME Sample ID: 2023-03-01-1
DIME Test ID: 2023-03-01-1-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-03-06
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Eva Torres
Date of test: 03/01/2023
Air Temperature: 15 F
Tire Pressure: 25 psi
Equipment PST #: 1000-7
Is Calibration within ± values: Yes
Weather: sunny
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: left to right
Edge used to measure position: left ti ru
Reference Distance 1: 50 ft
Reference Distance 2: 53 ft
Reference Distance 3: 56 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 15 ft
Position for Stationing 2: 15 ft
Position for Stationing 3: 15 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.36
Corrected Coefficients of Friction for Stationing 2: 0.62
Corrected Coefficients of Friction for Stationing 3: 0.02
Average Coefficient of Friction: 0.33
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/6/2023 ✔