Summary for Test 2023-01-28-10-1

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 215753
DEA: 050N72U4
EFIS: 0520000169
DIST-CO-RTE-PM05-SB-101-4.4/R7.7
Award Date03/01/2021
Closeout DateNot set
Work DescriptionPlease cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B.
Location Description101 freeway in Summerland, CA
QA Service Level1 (Verified on 05/06/2021)

Sample Information

Sample Taken Date01/28/2023 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/28/2023
Sample typeQuality Assurance A brief description of the sampleCRCP Concrete
The quantity of what the sample constitutes500cy From where was the sample collectedSupplier
First name of sampler or witnessed byDorell Last name of sampler or witnessed byHarper
Title of sampler Telephone number of sampler6692889248
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Padaro Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number231
The truck number from where the sample was collected1980 The batch plant ticket number from where the sample was collected11652
Concrete batch plantGranite Padaro Plant The fabricator/manufacturer designation for the sampleCRCP
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow. Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-01-28-10
DIME Test ID: 2023-01-28-10-1
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-02-11

Test Results


Input Type: Calculated
Tester's full name: Dorell Harper
Date of test: 01/28/2023
Air Content: 4.1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/11/2023