Summary for Test 2022-11-14-61-9
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 11/14/2022 | Sample Unique Key | 61 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 12/27/2022 |
Sample type | Aggregate Prequalification Program | A brief description of the sample | washed sand |
The quantity of what the sample constitutes | Ton | From where was the sample collected | Source |
First name of sampler or witnessed by | Antonio | Last name of sampler or witnessed by | Ramirez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | 2022-11-14-50 | |
The fabricator/manufacturer/facility name | Granite Buellton plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-42-0022 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-11-14-61
DIME Test ID: 2022-11-14-61-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-02-14
Test Results
Number of tests: 3
Input Type: Calculated
Tester's full name: Zaid Abdelkhaliq
Date of test: 01/30/2023
Temperature correction: 72
Temperature of solution: 72
Clay reading (test 1): 4.3
Sand reading (test 1): 4
Clay reading (test 2): 4.7
Sand reading (test 2): 4.1
Clay reading (test 3): 4.4
Sand reading (test 3): 4.1
Sand equivalent (test 1): 94
Sand equivalent (test 2): 88
Sand equivalent (test 3): 94
Sand equivalent before temperature correction: 92
Sand equivalent after temperature correction: 92
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/14/2023 ✔