Summary for Test 2022-12-14-28-1

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Sample Information

Sample Taken Date12/14/2022 Sample Unique Key28
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/03/2023
Sample typeQuality Assurance A brief description of the sampleBarlock couplers
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byHadi Last name of sampler or witnessed byMoradi
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Rebar Dayton Superior Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerDayton Superior Intermediate Assembler or Fabricator
Rebar Size#11 Coupler ModelBarlock D250L
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)Lot-196469 Heat-4000003065 Rebar Heat Number(s)4121072 6035693
Rebar Size 2 Coupler Unique IDSL-17-06

Test Details

DIME Sample ID: 2022-12-14-28
DIME Test ID: 2022-12-14-28-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2023-02-09

Test Results


Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 02/06/2023
UTM: 400kip
Temperature: 72.00 f
Halo ID: Large
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11No. 11/36mm1-0.00021.5613878188962Service Splicespaine

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 2/9/2023