Summary for Test 2023-01-13-38-8
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 993162 DEA: 07319104 EFIS: 0716000017 |
---|---|
DIST-CO-RTE-PM | 07-LA-91-R11.8 |
Award Date | 02/10/2022 |
Closeout Date | 01/11/2024 |
Work Description | ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR |
QA Service Level | 1 (Verified on 11/30/2021) |
Sample Information
Sample Taken Date | 01/13/2023 | Sample Unique Key | 38 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 01/18/2023 |
Sample type | Department Acceptance | A brief description of the sample | 1 1/2 PCC Aggregate |
The quantity of what the sample constitutes | 130 CY | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Pham |
Title of sampler | Telephone number of sampler | 2137924794 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | ROBERTSONS Paramount | Transportation Laboratory (TL) Number | C-0113A1 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0061 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Concrete pavement | The fabricator/manufacturer designation for the sample | Mix LB060008 |
The plant number | Paramount | A detailed description of where the material sample was collected | Conveyor Belt |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1-1/2 inch | |
The concrete mix design number | LB060008 | Lot number | |
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-01-13-38
DIME Test ID: 2023-01-13-38-8
Testing Lab: CT D07 - Plant Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-02-06
Test Results
Number of tests: 3
Input Type: Measured
Tester's full name: D.Padilla
Date of test: 01/24/2023
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.8
Sand reading (test 1): 4
Clay reading (test 2): 4.6
Sand reading (test 2): 3.9
Clay reading (test 3): 4.6
Sand reading (test 3): 3.9
Sand equivalent (test 1): 84
Sand equivalent (test 2): 85
Sand equivalent (test 3): 85
Sand equivalent before temperature correction: 85
Sand equivalent after temperature correction: 85
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/6/2023 ✔