Summary for Test 2023-01-14-2-1
Test performed: CTM 504-June 2010Project Information
Project Identifiers | Project ID: 993162 DEA: 07319104 EFIS: 0716000017 |
---|---|
DIST-CO-RTE-PM | 07-LA-91-R11.8 |
Award Date | 02/10/2022 |
Closeout Date | 01/11/2024 |
Work Description | ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR |
QA Service Level | 1 (Verified on 11/30/2021) |
Sample Information
Sample Taken Date | 01/14/2023 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/15/2023 |
Sample type | Department Acceptance | A brief description of the sample | JPCP-CYLINDERS @ 42 days |
The quantity of what the sample constitutes | 130 cu. yd. | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Philip | Last name of sampler or witnessed by | Maquiran |
Title of sampler | MREA | Telephone number of sampler | (213) 358-1518 |
Laboratory sample identification | 23-0036 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | RVC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | LB060008 |
---|---|---|---|
The truck number from where the sample was collected | 1509 | The batch plant ticket number from where the sample was collected | 7223350 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Discharge from TM into conveyor chute to wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-01-14-2
DIME Test ID: 2023-01-14-2-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-01-23
Test Results
Input Type: Calculated
Tester's full name: Phillip Maquiran
Date of test: 01/14/2023
Air Content: 1.6 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/23/2023 ✔