Summary for Test 2023-01-13-23-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 01/13/2023 | Sample Unique Key | 23 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/13/2023 |
Sample type | Aggregate Prequalification Program | A brief description of the sample | 1 x 4 |
The quantity of what the sample constitutes | Four bags | From where was the sample collected | Source |
First name of sampler or witnessed by | Javier | Last name of sampler or witnessed by | Macias |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Granite Construction Company Tracy | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-39-0002 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-01-13-23
DIME Test ID: 2023-01-13-23-1
Testing Lab: CT D10 - District 10 Materials Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-04-19
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Javier Macias
Date of test: 01/13/2023
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 99 %
Cumulative percent passing the 3/4 in. sieve: 75 %
Cumulative percent passing the 1/2 in. sieve: 48 %
Cumulative percent passing the 3/8 in. sieve: 15 %
Cumulative percent passing the #4 sieve: 1.6 %
Cumulative percent passing the #8 sieve: 0.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/19/2023 ✔