Summary for Test 2022-11-03-65-10
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
Award Date | 10/22/2020 |
Closeout Date | 12/11/2023 |
Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
QA Service Level | 1 (Verified on 08/24/2020) |
Sample Information
Sample Taken Date | 11/03/2022 | Sample Unique Key | 65 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/07/2022 |
Sample type | Verification | A brief description of the sample | 3/4" HMA-A-SP R25 |
The quantity of what the sample constitutes | 4 Bags Of Agg., 1 Bag Rap | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Antonio | Last name of sampler or witnessed by | Ramirez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0767A-22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Belt Cut at Granite Buellton | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-42-0006 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | 13960 | A detailed description of where the material sample was collected | Belt Cut at Granite Buellton |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-11-03-65
DIME Test ID: 2022-11-03-65-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-01-26
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: David Padilla/Zaid A
Date of test: 12/15/2022
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 94 %
Cumulative percent passing the 1/2 in. sieve: 80 %
Cumulative percent passing the 3/8 in. sieve: 72 %
Cumulative percent passing the #4 sieve: 62 %
Cumulative percent passing the #8 sieve: 35 %
Cumulative percent passing the #16 sieve: 19 %
Cumulative percent passing the #30 sieve: 13 %
Cumulative percent passing the #50 sieve: 9 %
Cumulative percent passing the #100 sieve: 6 %
Cumulative percent passing the #200 sieve: 5 %
General comments (publicly viewable) (Max 1000 characters): Comb. Agg, Gradation W/Rap Gradation Correlation Factors
Test was verified on 1/26/2023 ✔