Summary for Test 2023-01-13-3-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 993162
DEA: 07319104
EFIS: 0716000017
DIST-CO-RTE-PM07-LA-91-R11.8
Award Date02/10/2022
Closeout Date01/11/2024
Work DescriptionADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP.
Location DescriptionLOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR
QA Service Level1 (Verified on 11/30/2021)

Sample Information

Sample Taken Date01/13/2023 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/13/2023
Sample typeDepartment Acceptance A brief description of the sampleAggregate Base
The quantity of what the sample constitutes4860 SF From where was the sample collectedJob Site
First name of sampler or witnessed byChad Last name of sampler or witnessed byChotibhongs
Title of samplerMREA Telephone number of sampler213-817-0387
Laboratory sample identification23-0035 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNA Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)NA
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-01-13-3
DIME Test ID: 2023-01-13-3-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-01-13

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Chad Chotibhongs
Date of test: 01/13/2023
Gage No.: 60293
Test No.: 1
Nuclear By: Chad Chotibhongs
Non-Bias Plan No.: 1
Depth: 12
Material No.: Onsite
Material Type: Aggregate Base
Impact By: Chad Chotibhongs
Standard Count Density: 2164 g/cc
Count or Density 1: 2.12 g/cc
Count or Density 2: 2.21 g/cc
Count or Density 3: 2.18 g/cc
Standard Count Moisture: 639 g/cc
Moisture Count 1: 0.19 g/cc
Moisture Count 2: 0.2 g/cc
Moisture Count 3: 0.19 g/cc
Sum of Count or Density: 6.51 g/cc
Average of Count or Density: 2.17 g/cc
Sum of Moisture Count: 0.58 g/cc
Average of Moisture Count: 0.19 g/cc
Calculated Percent Relative Compaction: 96.9 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/13/2023