Summary for Test 2023-01-11-9-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 214573 DEA: 073096U4 EFIS: 0719000091 |
---|---|
DIST-CO-RTE-PM | 07-LA-210-R0.0/R9.7 |
Award Date | 04/03/2020 |
Closeout Date | 06/06/2024 |
Work Description | PLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 06/05/2020) |
Sample Information
Sample Taken Date | 01/11/2023 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/11/2023 |
Sample type | Department Acceptance | A brief description of the sample | PCC Aggregate |
The quantity of what the sample constitutes | 3 Bags of Aggs | From where was the sample collected | Source |
First name of sampler or witnessed by | Avo | Last name of sampler or witnessed by | Karajian |
Title of sampler | TET | Telephone number of sampler | 2137986076 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Associated Ready Mix - Sun Valley | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0025 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-01-11-9
DIME Test ID: 2023-01-11-9-2
Testing Lab: CT D07 - Plant Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-01-27
Test Results
Number of tests: 2
Input Type: Measured
Tester's full name: Avo Karajian
Date of test: 01/11/2023
Temperature correction: 0
Temperature of solution: 75
Clay reading (test 1): 5.1
Sand reading (test 1): 4
Clay reading (test 2): 5
Sand reading (test 2): 4
Sand equivalent (test 1): 79
Sand equivalent (test 2): 80
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/27/2023 ✔