Summary for Test 2022-12-30-2-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 215697
DEA: 07318204
EFIS: 0715000286
DIST-CO-RTE-PM07-LA-Route 1-4.0/4.2
Award DateNot set
Closeout DateNot set
Work DescriptionCM/GC Project - Work consists of constructing secant wall and slope restoration
Location Descriptionnear Point Mugu State Park 0.4 mile South of Sycamore Canyon Road.
QA Service Level1 (Verified on 08/26/2021)

Sample Information

Sample Taken Date12/30/2022 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/30/2022
Sample typeQuality Assurance A brief description of the sampleWCS PCC Aggregate
The quantity of what the sample constitutes50 CY From where was the sample collectedManufacturer
First name of sampler or witnessed byKevin Last name of sampler or witnessed byHopkins
Title of samplerPlant Inspector Telephone number of sampler
Laboratory sample identificationKH102B Linked DIME Sample ID
The fabricator/manufacturer/facility nameAssociated Ready Mix - Oxnard Transportation Laboratory (TL) NumberC123022B
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0054
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number61 A detailed description of where the material sample was collectedConveyor Belt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design numberSL4K455WHP Lot number
Sublot number Aggregate Mix Number

Combined Gradation Report Information

Combined Gradation Report IdBin IndexDime Test Id
No assigned tests for this sample.

Test Details

DIME Sample ID: 2022-12-30-2
DIME Test ID: 2022-12-30-2-1
Testing Lab: CT D07 - Plant Services
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-12-30

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Measured
Tester's full name: Kevin Hopkins
Date of test: 12/30/2022
Cumulative Mass RetainedCumulative Percent Passing
521 grams
0 grams100 %
10 grams98 %
102 grams80 %
194 grams63 %
288 grams45 %
384 grams26 %
460 grams12 %
498 grams4 %
499 grams
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/30/2022